Readings Newsletter
Become a Readings Member to make your shopping experience even easier.
Sign in or sign up for free!
You’re not far away from qualifying for FREE standard shipping within Australia
You’ve qualified for FREE standard shipping within Australia
The cart is loading…
The introduction into British army service of the Challenger2 Main Battle Tank (MBT) was originally intended to take a mere eighteen months from design to production, but in the event, it took something closer to ten years. Why this was so is an important part of the Challenger 2 story, and although on the face of it this might seem to be a clear failure, it actually produced the most thoroughly tested and reliable tank ever to enter service with the Royal Armoured Corps (RAC). The tank has now been in service for twenty years and can be expected to form part of the British army’s inventory
albeit in low numbers
until around 2035, which would make it the longestserving frontline battle tank ever used by the UK.
198 colour photographs, colour profiles, gloss paper
$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout
The introduction into British army service of the Challenger2 Main Battle Tank (MBT) was originally intended to take a mere eighteen months from design to production, but in the event, it took something closer to ten years. Why this was so is an important part of the Challenger 2 story, and although on the face of it this might seem to be a clear failure, it actually produced the most thoroughly tested and reliable tank ever to enter service with the Royal Armoured Corps (RAC). The tank has now been in service for twenty years and can be expected to form part of the British army’s inventory
albeit in low numbers
until around 2035, which would make it the longestserving frontline battle tank ever used by the UK.
198 colour photographs, colour profiles, gloss paper