Readings Newsletter
Become a Readings Member to make your shopping experience even easier.
Sign in or sign up for free!
You’re not far away from qualifying for FREE standard shipping within Australia
You’ve qualified for FREE standard shipping within Australia
The cart is loading…
Construction Change Order Claims brings you up-to-date with the latest methods for determining value of work or all types of projects. Commonly encountered claim issues are covered in detail, including:
Surety issues Evaluating changes resulting from ambiguous specifications or inadequate design Measuring the cost impact of delays Proving the price of damages
This all-in-one resource guides you through every type and aspect of change claims, offering hands-on guidance and analysis from 25 experienced practitioners. Construction Change Order Claims helps you quickly answer difficult questions such as:
Is a change order on a construction project an extra –or is it included within the scope of the basic contract price? When does an owner’s unintentional interference cross the line between a mere impairment or hindrance to an alteration of the contractor’s intended methods of performance? What specific circumstances support the use of the cardinal change doctrine? What circumstances must be present to employ the Percentage of Completion accounting method?
Construction Change Order Claims delivers:
Innovative defenses to avoid being bound by a release Guidance for anticipating contractor defenses, and for preparing opposing arguments Practical tips and accounting tools for evaluating progress and calculating payments Federal, state and local certification requirements for public and private projects And more!
Previous Edition: Construction Change Order Claims, Second Edition SKU 10046559-7777
$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout
Construction Change Order Claims brings you up-to-date with the latest methods for determining value of work or all types of projects. Commonly encountered claim issues are covered in detail, including:
Surety issues Evaluating changes resulting from ambiguous specifications or inadequate design Measuring the cost impact of delays Proving the price of damages
This all-in-one resource guides you through every type and aspect of change claims, offering hands-on guidance and analysis from 25 experienced practitioners. Construction Change Order Claims helps you quickly answer difficult questions such as:
Is a change order on a construction project an extra –or is it included within the scope of the basic contract price? When does an owner’s unintentional interference cross the line between a mere impairment or hindrance to an alteration of the contractor’s intended methods of performance? What specific circumstances support the use of the cardinal change doctrine? What circumstances must be present to employ the Percentage of Completion accounting method?
Construction Change Order Claims delivers:
Innovative defenses to avoid being bound by a release Guidance for anticipating contractor defenses, and for preparing opposing arguments Practical tips and accounting tools for evaluating progress and calculating payments Federal, state and local certification requirements for public and private projects And more!
Previous Edition: Construction Change Order Claims, Second Edition SKU 10046559-7777