Readings Newsletter
Become a Readings Member to make your shopping experience even easier.
Sign in or sign up for free!
You’re not far away from qualifying for FREE standard shipping within Australia
You’ve qualified for FREE standard shipping within Australia
The cart is loading…
One-liner: When is it more cost efficient to replace an aircraft rather than continue to maintain it? 450-character abstract: The report presents a model of the repair-replace decision for aging aircraft and data describing the C-5A cargo aircraft. The authors examine the decision whether to modify or retire the C-5A fleet. They also extend the modeling approach to evaluate prospective investment in additional depot-level capacity. The study’s preliminary conclusion is that the C-5A’s planned reliability enhancement and re-engining program modification is worthwhile if it occurs soon.
$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout
One-liner: When is it more cost efficient to replace an aircraft rather than continue to maintain it? 450-character abstract: The report presents a model of the repair-replace decision for aging aircraft and data describing the C-5A cargo aircraft. The authors examine the decision whether to modify or retire the C-5A fleet. They also extend the modeling approach to evaluate prospective investment in additional depot-level capacity. The study’s preliminary conclusion is that the C-5A’s planned reliability enhancement and re-engining program modification is worthwhile if it occurs soon.